Skip to main content

Hello, Anyone have some pics of atlas o gauge running through a hellgate bridge with the 2 tracks. Using atlas track that I think it will have to be shimed up at entrance & exits. Would like to know if anyone has done this & how it was fastened. Guess I could also get 2 tubular straights & then switch over to atlas. Does this transition affect anything? May be the easiest way.

John

Original Post

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×