Skip to main content

The fellas got together and we got some steady progress.    Last week, Dean and I made a list of action items and this helped keep us on track, made sure we assigned work and the results were encouraging!     You can see the curve to the milk depot, the spurs to the slaughterhouse with the freight depot beyond it, the dock area [Dick made great progress on cutting scale lumber to deck it] and the car float placement.     Next week we hope to get more wiring completed and two more curved turnouts placed.

Enjoy

Attachments

Images (3)
  • float placement
  • milk curve
  • slaughter area and freigh depot
Original Post

Replies sorted oldest to newest

Hi Ed,

I will scratch out a drawing, shoot a picture and add comments.    It is 30x50 on the second floor of a family building in Seattle.    We do have potential to add more as the adjacent room is 22x30----that would be a hoot to see down the road eh?

 

The middle portion for the steel complex is not built yet---we want to run some trains; next week we aim to wire more so I can set up the DCC.

 

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×