Since both of these buildings (see photos) predate Lionel's Fastrack, I need to know whether they will accept/work with Fastrack either with or without physical accommodations/alterations to either the Fastrack roadbed or the buildings.
If alterations are needed, what eaxtly is required? Also, for anyone who's using these structures with Fastrack, what is the sideways clearance between odge of the Fastrack roadbed and the building entrance door openings and also the train height clearance between the top of Fastrack rails and the top of the doorway openings?
Thanks in advance for answering my questions.
Kenn, ogaugeguy