Skip to main content

Hi Everyone and Happy New Year.

 

I have several of MTH's structures that I will be wiring to my O Gauge layout.

I most cases I need to extend the 2 wires for each unit to the terminal block and the AIU.

It seems the existing wires ate about 18 or so gauge. Since I have a spool of 16 gauge wire

is there any issues using it to extend the structure wires? Since these units are just lights,

I am not sure if I want to wire them to the AIU and rather just wire them to a terminal block

and power it with a Z-500 or so. Any input on this as well.

 

Thanks very much,

Trackahead

Original Post

Replies sorted oldest to newest

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×