I tore my old layout down in the spring and totally rehabbed the basement. It is now sufficiently completed for me to start my new layout plan. I had to first negotiate space allowed from spouse; ended up with about 13.5 ft x 16.5 ft partially underneath stairs. After much review on this forum and reading several books, I decided on a two level layout with access panels to get to the various points on the layout. A friend helped me get started and then I downloaded SCARM and started using it. While I have not mastered the software, I put together a concept to start. I have attached the file. There are two walls and the rest is open to the basement.

My basic concept was to be able to have a double main line on lower level and a connected upper level. All tracks need to connect so a train can go anywhere. I used Fasttrack to design layout with O48 on top level and O60 and larger on lower level. I have a passenger station that I placed on the layout. I do have some steam engines and a water tank, coaling tower and sanding tower I would like to place somewhere. Don't have too many other items but may want to add a few post war items I have in storage; oil derrick and auto milk car.

 

George

GEO Rev1

GEO Rev1

Attachments

Images (1)
  • GEO Rev1
Files (1)
Original Post

Replies sorted oldest to newest

Russell, you read my mind. I am concerned I may have too much going on in the space I have. In general I am more interested in the trains than scenery but would like to have a small town on top level and in the corner.

 

Harry, one of my earlier layouts had an around the room, walk in the middle type layout. As my space got "squeezed" I tried this type layout. I may still go back to around the room in a folded dogbone pattern and maybe connect the two ends with lift out or swing bridge. That may fit with Russell's comments on maybe being too complex operations.

 

Thx for response.  Some things to ponder over holiday.

Happy Thanksgiving.

 

George

Hi Kenjr,

Check out this thread, New Layout progress by an experienced and published model railroader. It will provide you with some inspiration and ideas.

 

The experience shows throughout the design and construction. A lot of action, future expansion, multi-level, easy access, great viewing and it goes on. It represents 8 months of work from start to now.

 

You may be able to fit all larger turns using the folded dogbone. You will definitely save on materials cost.

 

Getting the train room area ready is a big enough task. Have fun! 

Thanks for the additional feedback. I did a tweak in the upper left and eliminated the switch and siding on the lower level from there and instead added the turn-out on the lower left.

Thanks for the link Moonman. I have been following several of the threads. One of the things I learned is your choice of track and switches can make a big difference in flexibility. Especially those that choose Ross switches and can used curved turn-outs it really can save space. I haven't made any major commitments yet on track, so I will have to review my options.

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×