Skip to main content

Replies sorted oldest to newest

Thomas,

Nice work. I well understand how much time it takes to scratch-build even small structures and detail them nicely, as you have done. My under-construction 10'-by-5' layout has now has twenty-one structures, of which four are scratch-built and fifteen are from craftsman kits. I have been working on it for almost four years. Some buildings have taken one-hundred hours to build.

MELGAR

Last edited by MELGAR

image1[5)image1[7)image1[5)image1[1)image1[6)image1[9)After being  disappointed in the price of trees, I looked around on the forum and found trees made of furnace filters. Having the filters, I went to the hobby shop and Walmart and bought Dowel rods and paint. The one I cut circles and the other one I drilled holes in the trunk and put tooth picks in it. Then I sprinkled on Flock and Turf and added some paint. High priced trees may look a lot better, but I can live with these.

Attachments

Images (6)
  • image1(1)
  • image1(4)
  • image1(5)
  • image1(6)
  • image1(7)
  • image1(9)
Last edited by Thomas Smith

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×