This project will be a court house, a fire department and a police department and has an interesting footprint for the buildings.
The court house is in the center with the fire department building attached on it's right side.
The small two man police department building is attached to the left side of the court house.
The base for the buildings is cut from a piece of re-cycled plywood.
It is fastened to a piece of paneling with wax paper in-between them.
The piece of paneling that the base is set on will be the paved parking area in front and behind the buildings.
When I glue the side walls on the base, the wax paper will keep the glue from sticking to the paneling.
Here are the front of the court house and the side walls.
The fire department building is set back from the front of the court house so the fire trucks can park in front of the building and not be in the road.
In the center is the back entrance to the municipal building.
Working on the roof sections for the buildings.
My original design had round holes in the top of the tower on the corner of the fire station.
Each of these round holes were going to have a clock in it but I have changed my mind on that.
So I have filled in the round holes in the tower and put in one more window opening in the front of the tower.
Marie threw out an empty laundry detergent bottle the other day and the cap on the bottle caught my attention.
Using the cap as a base, I'm going to make a clock tower to fit on top of the municipal building.
Here are the parts for that tower that I have made up so far.
Here is the clock tower.
The roof will have shingles on it once I get to that stage in the building process.
The porch roofs and steps are built for the rear entrance to the municipal building and the fire department.
The steps are done for the front of the police department and I've started on the front entrance for the municipal building.
As with the clock tower, the steps, porches and roof sections are all built separately to make everything easier to put the finish on them.
These items will be attached after the outside finish is put on the building.
This is the porch railing that I made up for the rear entrance to the municipal building.