Before I start running extra wire, can anyone share recommendations for the best power drop locations on this temporary Christmas fastrack layout?

I'm pretty sure I need 4 drops minimum, but I'm thinking I might need 7 drops to provide consistent power for the middle sections between the switches. But before I start running that wire, I wanted to ask the experts here.

My plan is to run two trains simultaneously on this layout; one is a Big Boy.

EDIT: I should also mention I'm powering this with a Lionel 180-Watt PowerHouse and am running Legacy engines only.

Christmas Layout Example

Attachments

Images (1)
  • Christmas Layout Example
Last edited by Rob Greer
Original Post

Replies sorted oldest to newest

From another similar thread by the OP, this is a FasTrack Layout.  This track plan (maybe drawn in AnyRail) doesn't show 1-3/8" fitter pieces attached to the divergent ends of the Wyes.  If they are actually used on this layout, then there would be more track joints than shown in this plan.

Also with a FasTrack layout that is subject to repeated assembly and disassembly, the connections loosen and develop higher resistance at the track joints.  Either way, about 7 feeders as John suggested, may be a good idea, IMO.

Last edited by SteveH