Anyone use 4" foam as their layout foundation instead of plywood? I'm planning my Christmas layout which I change every year. I'm considering skipping a plywood base and going with foam instead. It would be easier to make holes for wiring with a hot wire tool rather than drilling through wood, especially for those instances where the layout is already up with ceramic buildings and accessories. My one concern is the strength of the foam to bear the weight of the trains, houses, and accessories. It would be braced underneath with wood strips about every 12 inches.
Your thoughts? Lessons learned? Thanks