Skip to main content

Unless there is a way to post a thread on multiple forums I think it best to place the body of my post here also as linking to my post on the subway forum will push the thread back showing little interest.

 

It's been a while.  I have dismantled my old layout.  My new home is coming along and I have had a section built for my new layout in the basement.  It is an "L" shaped room that is 23x18 with a 5.5x8 cut out to make the "L" shape.  I may not get to the layout until the late winter at the earliest. The floor is now tiled.

b1
b2
b3
b4
b5

Here is the new 3 track subway plan (added an express track to the subway) NOT showing the 3 track elevated design.  All total there will be the capability to run SIX (6) trains at once unlike the single train snake through the entire basement of my old layout.  Initially I will focus on the subway only, but it still means THREE (3) trains capable of running at once.  The plan shows the tracks on a ramp leading to the elevated line.

Plan

3T_P

3D Render

3T_1
3T_2
3T_3

Attachments

Images (9)
  • b1
  • b2
  • b3
  • b4
  • b5
  • 3T_1
  • 3T_2
  • 3T_3
  • 3T_P
Last edited by Joe P
Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR
×
×
×
×
Link copied to your clipboard.
×
×