I have a Z4000 powering the main level of my layout w/ each bank powering an inner and outer main lines. My layout is an around the walls design in a 20 x 20 room. I am planning to add a lower level, 4-track staging yard and engine yard on two walls, and two transition grades. Do you think I need more than one Powerhouse to power this lower level? Can those units be directly connected to the track without some sort of voltage/throttle control? Sorry, I'm not familiar with Legacy, but I will be getting the Legacy command system soon. Thanks for you replies and input.
Geno