Skip to main content

Once again, I'm out of room. I'm thinking of future sidings - here is one. I've got about 4-5 inches here between the track and buildings. Not sure what would work best. This is about 30 inches of straight track on the main line. I'd like to put the switch in where the caboose (silver roof) is and run to the curve at the far end. 

 

What Ross Switch would you recommend I use for this tight spot? 

unnamed

Attachments

Images (1)
  • unnamed
Original Post

Replies sorted oldest to newest

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×