Skip to main content

Established the elevations for the primary and secondary main lines and began to build the grades on the left peninsula and across the top of the layout.  Construction is L-girder / cookie cutter.  Grades built with risers and cleats. Hopefully, this trip down I'll also be able to build the grades on the right peninsula.  This will be a little more tricky due to the number of over / unders involved.  The wish list for this trip is:  attach left pen and top sec of subroadbed to cleats, get some sections of homasote roadbed cut,  paint plywood subroadbed, paint homasote roadbed.  It's a wish list .  Here's how it looks so far. 

Attachments

Images (5)
  • 20221231_133109
  • 20230103_134635
  • 20230103_134915
  • 20230103_134928
  • 20230103_134934
Original Post

Replies sorted oldest to newest

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×