Established the elevations for the primary and secondary main lines and began to build the grades on the left peninsula and across the top of the layout.  Construction is L-girder / cookie cutter.  Grades built with risers and cleats. Hopefully, this trip down I'll also be able to build the grades on the right peninsula.  This will be a little more tricky due to the number of over / unders involved.  The wish list for this trip is:  attach left pen and top sec of subroadbed to cleats, get some sections of homasote roadbed cut,  paint plywood subroadbed, paint homasote roadbed.  It's a wish list .  Here's how it looks so far. 