Currently have a GW-180 transformer powering my lower level of track where I often have 6-7 locomotives plus rolling stock, passenger cars etc. running. I am probably pushing the limits of the current transformer, so looking at upgrading to the ZW-L. Also have a second and third level each powered by a separate CW-80 transformer. Currently running everything in Bluetooth and awaiting the Base3.
Am I able to add the ZW-L and devote the entire 620 watts to all three levels of the layout all controlled from handle A? Do I accomplish this by setting the channel switch to 1? If not, how do I go about allocating the full wattage of the ZW-L to my layout vs. dividing the wattage up by handle?
Thanks,
Bradley