With cramming more stuff onto the layout as I rebuild it, I assumed I would not be able to run my 210 crane. I was correct. Running it boom backward, I can run it around the outer loop, but the boom drags on the wall and the Mecanno bridge. I think the MTH small crane, 500 series with the O 810 super structure will look out of place with the 200 series freights. Has anyone attempted to remove a couple of inches from a 210 boom. Just wondering.
Steve