I'm installing a bridge on a line that is on a grade (2%). Should the bridge be mounted to maintain the grade (bridge is also mounted at 2%), or should it be level, and the rest of the track grade adjusted to compensate for the level bridge track?
Suggestions/Comments?
Thanks, Dale