Skip to main content

Replies sorted oldest to newest

Having a layout, workbench, 12X24 "train building" and WAY too much stuff - no, I don't "put them away".

 

And around here, I would definitely not put them away for the "summer" - as summer

here is hot, muggy and sub-tropical. I actually work on them less in the winter,

as my shaded and insulated RR building is quicker to A/C than it is to heat.

 

I "put them away for the winter", if anything. 

We have a simple set up lay-out 9x9 feet. I used some damaged hollow doors I picked up from Menard's for $5 a piece, threw some in door out door carpet and set up 3 lines.

2 Fastrack and the 3rd is the old  stuff we had from my Dad's layout. Although my 10 year old son and I have been wanting to tear it down and put up something nice we are so busy we don't have the time and want to run the trains whenever we can.

 

What really through a wrench in the works is when we took delivery of those Lionel Lion-Chief Steamers. Those are so much fun any new layout plans are on hold till the Winter.

 

I just found out the Lion-Chief Diesels came out.

 

At Thanksgiving we set up a G-Gauge loop around the Christmas Tree and that stays up till about Febuary then it goes back downstairs.

 

BUT 

 

this Summer as part of our "doing something about the back yard" project, we installed a waterfall or I should say my wife went ahead and had it done. There is room to have the G-Scale incorporated into the garden but I have to have the local Garden RR fellas come by to see how we can do this.

 

For those that want to mentally relax after a high stress day waterfalls, trains, airplanes and yea an adult beverage do wonders!!

 

Happy Hobbying!!

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×