Skip to main content

I altered the first design slightly to eliminate a pending disaster. Do you think you could live with this?

I show left side, right side to "stitch together" if you can. Then tossed in the middle, which is shown in the other two as a section. Now, to pick it all up, put down snow batting, and lay it down again.

I appreciate your thoughts....nothing is set in stone yet. But I have to have some track where it is to accomadate some accessories.  The goal is to be able to run 4 trains at once with DCS.

Have a great day, Greg

LEFT BOARDRIGHT BOARDCENTER BOARD

Attachments

Images (3)
  • LEFT BOARD
  • RIGHT BOARD
  • CENTER BOARD
Last edited by cngw
Original Post

Replies sorted oldest to newest

Add Reply

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×