Skip to main content

Has anybody on here, even though you're 3-rail guys, ever hand laid your track?  I have found that all modern pieces (except for the 1989 Lionel semi-scale B6 switcher re-issue) and all postwar O gauge equipment will operate very comfortably on code 148 rails.  Postwr Lionel wheels go through a scale turnout frog with little to no modification whereas your angled wheel modern rolling stock need a bit more modification since the flange sits back further from the outside face of the wheel.  I have used bass wood for my cross ties and I spike down my rails. For track which is closest to the viewer, I use tie plates made of either plastic or pressed cardboard. It's a lot of work but when your 18+ pound Allegheny rumbles by on your rails, your layout takes on a different characteristic, it's even more of a part of you. I love building my turnouts and creating easements into my curves. For that annoying third rail, I use code 100 rails which counter sinks below the top of the larger code 148 which is great when taking realistic type photographs.  I remember an article in OGR back when it was O scale 2 rail and 3 rail journal from around 1990 or 91.  The truer 1/4" scale rails make your realistic/scale locomotives look even more realistic. It is true I cannot run anything prewar on it unless they are the 700E and scale freight cars or the scale B6 switcher.

Last edited by Rjm
Original Post

Replies sorted oldest to newest

Dave, right now I have no layout as it was disassembled a few years ago. I would go to my parent's home and take measurements on a weekend while I was in graduate school and then go back to my apartment about 100 miles away and build my switches using the measurements I had taken and the O scale rail gauge I have. I built my switches on poster boad so when I took them to insert them in my dad's layout, it was like inserting a typical switch from Atlas or so. I had mentioned that my middle rail was smaller than the outer rails so I built 'ramps' as the rollers had to ride up and over the 'wheel rails'. I would mix my hand laid track out closer to where the viewer could see it and in tunnels or toward to back of the layout, I used Atlas 2-rail and mounted a code 100 rail in the middle of it. I have to say that as smooth as a modern freight car rolls on any of the manufacturered 3-rail track, they rolled so much quieter (and further) on these code 148 sized rails. I tell ya, the 2-railers have nothing on me!!!! It's too much fun and I cannot wait until I get a house where I can build again. Oh, and my switches were the same as number 8 turnouts and number 6 turnouts so they were pretty gradual. The crossties are also stained to look a little different in color like real ties, that's the one thing I didn't like about even the Atlas 2-rail track as the ties are plastic and all the same color. Currently, my tracks are about 1400 miles away from me in storage so I can't get to them right away. 

Last edited by Rjm

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×