CBQer posted:Several thoughts here. Hand laying track is easy using code125 or 148 rail. 148 looks like today's mainline. Handlaying switches can be something else. I don't have the patience to do it. You can get pre-made switches that need ties in various numbers eg., 4,6,8. you can get code 148 switches from Atlas ready to go in 5 1/2 and 7 1/2 that are good switches. it is less expensive to hand lay but takes more time. Atlas flex track is about 40" long and looks good especially if you paint the rail as I did. Sectional track is also available.
Dick
Hey Dick,
How and what do you use to paint your track?
Dave