Hello,
I have posted my first YouTube video of my first video of the Joliet & Western Railway.
You can find it here:
The video shows an eastbound test train on the east main. Both mainlines are 263 feet each. Total track is 697 feet. It took ~2 minutes, 12 seconds running hands free at notch 8 on a Lionel ZW-L to make a full circuit on the east mainline.
As you will see, the layout still needs a lot of landscaping and a control panel (overhead mounted), but the trains run very smooth and not too loud.
Cheers,
Tim
Joliet & Western Railway