Skip to main content

Replies sorted oldest to newest

Originally Posted by luvtrains:

Nice! I like the twin bridges. Looks like you have fastrack. Did you use it on the bridges? If not how did you connect fastrack to the bridges' tracks. I like the graded curve leading up to the bridge. 


luvtrains,

 

The bridges are Atlas O Pratt Truss Bridges. They come with Atlas track installed in the brodge deck.  I just used a FasTrack TRansition piece (Transitions from FasTrack to tubular) then on the ends of the Atlas bridges you attach Atlas Tubular Transition Clips and just slide the into the Tubular FasTrack Piece.

 

Here is a more current Video with the Elevation work finished.

 

..Gromet

 

 

 

 

 

 

Gromet;

Coming along nicely, Love the Redneck engineering in the first video.

Get Er Done. 

 

Nick:

I agree, Adds to my determination to double the mainline on the new Layout.

My Goodness do I need a lot more track !

Cases on hand, Cases on order but I think I'll still be short.

Track plan still in flux but I really like what Gromet has done.

Food for thought.

Post
The Track Planning and Layout Design Forum is sponsored by

AN OGR FORUM CHARTER SPONSOR

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×