Skip to main content

I am just setting up my 4019 premier big boy.

Does the draw bar go under the slot in the tender or through the slot in the tender.  Are their any videos on how to connect these draw bars?

The instructions say to slide the loose end of the spring to the opposite side of the draw bar?  Can't really see what they are doing.

Original Post

Replies sorted oldest to newest

Yes, comes up from the bottom into the connection point. The Square post goes into the drawbar, and they are telling you to push the spring rod on the drawbar (if it has one) so the post can go into the drawbar and the spring then touches the post to help create a chassis ground between engine and tender chassis.  G

Add Reply

Post
This forum is sponsored by MTH Electric Trains
×
×
×
×
Link copied to your clipboard.
×
×