Skip to main content

https://youtu.be/OeuejpjGzyo?si=PcTRBnT7B5KkJCX8

This is my first attempt with a semi-permanent installation. As it happens to many of us, 3 years ago this all started as an oval track with two switches to run trains that have been stored for almost 15 years. That was on a small corner of my computer workstation I recently built and installed. With the shelving and counter space footprint in place the table was quickly overrun with track ,wires and trains, the computer and workstation relocated and the expansion of the table began as well as incorporating the grade to build up!

IMG_9157Now my dream is a plan, this layout will be coming down, my basement to be finished and the next step taken to a well planned layout build will begin.

click on the link above to watch my video on YouTube

Many thanks to the OGR community for all the amazing input posts and ideas.
This forum has been such a valuable resource of information even way before I joined.

Attachments

Images (1)
  • IMG_9157
Last edited by Tim A#1
Original Post

Tim, you have really packed in a lot of railroad in a small space!  A man after my own heart!!  The trains are really tooling around the layout handsomely!  I really like all the lighting you have under each level!  Well done!

I have the same feeling for this forum as you do.  So many folks have helped me and given me inspiration since I joined 13 years ago!!

Add Reply

Post
×
×
×
×
Link copied to your clipboard.
×
×