Skip to main content

Aside from my Dept. 56 Snow Village, this is my first layout I have actually done.  Minus the trains, the cost was under $300.  Half of that was spent on hot wire foam cutting tools.  All the mountains were made with white styrofoam I picked up at the local furniture stores for free.  They were happy to get rid of it.  It has a functional waterfall.  It has two ready to run trains on different levels, a Cascade Range Logging and a Copper Range Mining.  At the very bottom is a non-running porter with 3 v-dumps.  It was an after thought and if I ever get the ambition, I will get it running.  I will be happy to take all criticism and ideas.

Attachments

Images (4)
  • 100_1626
  • 100_1645
  • 100_1633
  • 100_1646
Original Post

Replies sorted oldest to newest

Post
×
×
×
×
Link copied to your clipboard.
×
×