Skip to main content

Replies sorted oldest to newest

Tunnels on this year’s Gobblin’ Gulch Halloween candy-delivering layout:

imageimage

They’re really more portals than tunnels, but from the viewpoint of the trick-or-treated they look and function like tunnels.

The two clicks you hear at the end of the video are the second and third log dump cars dumping.  I failed to trigger the first one.  Log dump cars are how our candy bars are delivered to the ~250 kids next Thursday and for the past 4 years.

Attachments

Images (2)
  • image
  • image
Videos (1)
75141841547__3DDEEB36-7AB6-4CA0-8F68-12204BC74731
Last edited by Hannibal-St Joseph RR
@CSXJOE posted:

Don't have any photos but what we have done is place the non rotating searchlight car in front of a camera caboose.  The image is projected on a large flat screen tv located on the wall behind the layout.  Gives visitors a look of what the inside of the tunnels look like.

That's not a bad idea! I already have a video projector mounted to the ceiling over the layout (feeding audio to the 100 watt Fender Rumble Bass amplifier under the layout), so all I'd need is a small wifi-enabled camera and a wifi dongle to feed the video into the projector to get a real-time tunnel experience. The searchlight car illumination idea is good, too. Hmmm . . .

Here are some tunnels/entrances on my layout.

I built this rock portal using rocks I selected and brought home from a nearby river.

IMG_0301

This tunnel has a partial real stone interior.  I also found some flat rocks on the banks of a nearby river, brought them home,  and used them as an interior near the mouth of the tunnel.  Doing this gives the impression of the tunnel having been carved/dug/blasted out of stone. IMG_1025

You can see the real stone on the left and paper bricks on the right.   I've since replaced the brick paper with black foam board.

IMG_1024

A favorite vantage point for viewing train on my layout.

IMG_0979IMG_0421IMG_0081

Attachments

Images (7)
  • IMG_0421
  • IMG_0081
  • IMG_1025
  • IMG_1023
  • IMG_1024
  • IMG_0818
  • IMG_0979
Last edited by trumpettrain

The Toad Hollow Tunnel is near Bohemian Falls on the Northwestern Pacific RR right-of-way.  Engine #730 is celebrating steam by pulling an excursion “wildflower special” for enthusiasts in the coastal mountains of Northern California.  Note the men, they do not work for the railroad.  These moonshiners were surprised while making “hooch.” Trespassing along the little used and remote track is common.

0-4-0_toad_hollow_tunnel

Attachments

Images (1)
  • 0-4-0_toad_hollow_tunnel

The configuration of my layout required getting creative.  With two loops in the tunnel and a camera car in the collection, I needed to line everything and install 5 tunnel portals.  One of them had to be 4’ wide to prevent binding.

All but one of the portals were repainted using washes and dry brushing techniques.  The exception was the 4’ tunnel portal that is hard to see on the back of the layout.

IMG_5228IMG_5227IMG_5226

The 4 ft opening was required due to double switches that ended up partially under the upper level.  Made the opening out of a double portal with ridged foam insulation spliced then carved into each side of the center keystone.

IMG_5342IMG_5345IMG_5347IMG_5349IMG_5442

The interior of the tunnels were lined with foam board and then covered by painted crumpled brown craft paper to imitate rock.  The painting method was textured spray paint, then dry brushing a few colors.  It required 8’x4’ sheet of paper to completely line.  The floors of the tunnels were finished with glued down unscented gray clay kitty litter to save money over traditional ballast.  It took over half a jug of kitty litter to complete.

IMG_5327IMG_5325IMG_5334

Lining the tunnel was necessary due to a decision to add an avalanche shed effect on part of the tunnel.  The track is on the edge of the layout in the tunnel area.  Instead of covering it all, I wanted to add visual interest by partially seeing the trains passing in the tunnel.  It also needed to be structural to help support the upper level that overhangs the lower level at that spot.  The shed was made out of plywood and 1/4” rigid copper pipes.  All painted and dry brushed.

IMG_5386IMG_5387

I still have work to do on the sides of the mountain, but the interior tunnels are complete at this point.

Attachments

Images (13)
  • IMG_5228
  • IMG_5227
  • IMG_5226
  • IMG_5342
  • IMG_5345
  • IMG_5347
  • IMG_5349
  • IMG_5442
  • IMG_5327
  • IMG_5325
  • IMG_5334
  • IMG_5386
  • IMG_5387
Videos (2)
IMG_5444
IMG_5388

I’m still chipping away building this tunnel scene. I never seem to be able to get in much more than 30 minutes work anymore, but still lots of fun when I can. I had started on the east portal several months ago and installed liner in slightly more than half at that time. I finally got the west portal and remaining liner roughed in over the weekend. Now I just need to finish taping and mudding the liner and finishing everything else in the scene.

East portal section.

IMG_8352

West portal and roughed in liner.

IMG_8346

Attachments

Images (2)
  • IMG_8352
  • IMG_8346
@jgtrh62 posted:

I’m still chipping away building this tunnel scene. I never seem to be able to get in much more than 30 minutes work anymore, but still lots of fun when I can. I had started on the east portal several months ago and installed liner in slightly more than half at that time. I finally got the west portal and remaining liner roughed in over the weekend. Now I just need to finish taping and mudding the liner and finishing everything else in the scene.

East portal section.

IMG_8352

West portal and roughed in liner.

IMG_8346

Nice job Looking forward to the finished job!

Add Reply

Post
×
×
×
×
Link copied to your clipboard.
×
×