Skip to main content

Replies sorted oldest to newest

Thanks for all the kind words. 

 

The layout plans have been finalized and I picked up all the track and switches needed at York in April.  The layout will be a folded dogbone with a double track mainline with dimensions of 17 x 34.

 

Couple questions were asked above, let me answer those:

 

Nick, Lighting is tricky in a basement.  I ran a circuit with dimmers for recessed lights and an additional circuit for track lighting to run around the layout.  I will install the track lighting once the benchwork is installed.

 

69Nickey, The blue paint color is "Riviera Blue" and was Behr flat latex from Home Depot.  Do not use the paint with primer in it, the integral primer prevents a completely flat finish.  The black used on the ceiling is Sherwin Williams black acrylic Dryfall.  This is factory mixed flat black and designed for this type of application.

 

Brian, The door will be spanned with a lift up section.  That door is the access to my mechanical room, furnace, hw etc.

 

 

Originally Posted by MichRR714:
Originally Posted by Andrew87:
Nice how long until your able to run?

Wish I had the answer to that.  I plan to have the benchwork done by mid September.

You have an excellent start.  Don't rush.  A good plan and careful execution will give the best possible results.  (But you probably already knew that)  

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×