Cheers!
We have a most amazing Custom TW TrainWorx layout currently 'Under Construction' in our Dallas Studio and I can absolutely confirm that it is by far the MOST EXTENSIVE and MASSIVE signaling control panel we've EVER done! It has truly been an eye opening experiencing for yours truly watching this panel come together. We've got the best of the best working on it and for the next two weeks, we've got our East Coast Director, Mike Reagan, in our Dallas Studio working side by side with the Traingineers
This layout is being done for a gentleman that recently retired from the railroad and he wanted his custom layout modeled after the New Haven RR. Talk about a man with a RR Vision... well heck, ALL our clients have incredible RR Visions!!!
I literally thought they were joking when they told me this layout would have a signaling control panel on one side (for 87 signals) and on the other side... switching control panel with over 40 switches - FOR REAL???????????????????????????
Captured a little action with the Signaling Control Panel and asked my fav question to Traingineer Roy... "WHATCHA DOING????"
Enjoy!!
Happy Tracks!
TrainDame aka Dorcie Farkash
TW TrainWorx
Dallas, TX | Concord, NC
(214) 634-2965
www.blog.traindame.com