Skip to main content

Replies sorted oldest to newest

I was looking thru a book on the Seaboard Air Line not long ago and noticed a photo of one of their yards.  It looked like the track was disappearing in the dirt/cinders, didn't see a lot of ballast like on a mainline.

 

I've got my small yard built on a plywood base, then 3/8" rubber matting for roadbed, then track.  Between the tracks I used some Fusion Fiber:

 

http://www.truescene.com/products

 

I haven't put any "fill" (ballast, dirt, etc) on the track yet, but plan on doing something soon as soon as I get more Fusion Fiber to fill up some low spots and cover the sides of the roadbed.  Here's a couple of photos showing the rubber and Fusion Fiber (covered with cinders and small ballast):

 

 

 

On my old garage layout I had a yard covered by a single sheet of the rubber matting.  It was simple/easy to lay down and made things very quiet.

I submerged my Yard tracks to have tie tops at ground level. The tracks are laid directly on the underlayment and 5/16" foam board is laid [glued]on top between the tracks. In most of the steam era yards I observed the top of ties were generally at ground level.Black oily ballast shows down between the ties.

 

IMG_1630-001

Attachments

Images (1)
  • IMG_1630-001
Last edited by Dewey Trogdon

I did what Gilly suggested above.  After track was laid directly on the Homasote, I cut strips of 1/4" extruded styrofoam, painted them black, and glued them between the tracks.  This brought a black "ground level" up to the tops of the ties.  A little black/cinders ballast mix completed the basic job.  I used some HO cinders on top along with some Woodland Scenics earth blend here and there.

 

Click on the photo for a larger view.

 

 

PHOTO 15 small

Attachments

Images (1)
  • PHOTO 15 small
Last edited by Bob

When I was building my last layout I managed to acquire a large amount of N scale cork roadbed at a very cheap price.  I found that laying this between tracks in the yard gave the desired effect of making the ties appear to be sinking into the landscape.  An added advantage was that I could use the beveled side when I wanted to create minor ditches.

I used Woodland Scenics foam roadbed on all my mainlines, but just laid the tracks directly on the plywood in all the yards.  This saved a lot of roadbed material and lowered my yards prototypically.  The sounds are not bad at slow speeds so that was not a problem.  I like the idea of filling in between the yard tracks before you ballast.

 

Art

You can't really see it from this angle but the outer track (mainline) is elevated the highest from the ground level. The next track in is the siding, and it's about 3/16" lower than the mainline. Then all the inner industry tracks drop down to ground level and will be buried in the dirt. Most likely the ground level is even with the top of the rail head, so when you walk around on the ground, you're not stepping over the rail.

This is normally the case, especially with industry tracks that have been around for decades. 

IMG_0169

IMG_0171

Attachments

Images (2)
  • IMG_0169
  • IMG_0171
Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×