Skip to main content

well after forever i finally got around to finishing the scratch built Seatrain crane i have been working on.  I still have to build some supporting structures around it and integrate the rest of scenery. I have never cut so many angles in all my life and hiding wires for lighting is lots harder on open structures that buildings lol.

 

4C5937FE-F1C3-440E-A597-9437CEE0AFFE

here it is where it is going on the layout  not perfect space but this is one of those cases where i saw the crane and had to build it then realized i needed a place for it on my layout.  Yea kinda backwards but hey ya gotta build what ya like!  Gonna put a dock and some water in front of it.  Maybe someday ill build a cut away ship to load.

74E8F286-8DFF-48E7-B7FA-5A29CB4B67B1

 

close up of main crane deck

71C5B93F-8F4C-4EDC-B90F-C4F7152545D9

267DD8D1-BA45-42D1-81E0-9563B0EFEA21

 

nighttime pic with a car ready to be loaded.  I guess he is waiting on the ship lol.

A6601ADE-A67D-4947-B389-857CFC84B3C9

 

 

here is the original idea i found in old popular science magazine online.  There are actually quite a few pics online which helped.

3CBDCABF-9CB0-466F-840B-96F3AD47E627

 

97AA12BC-F680-4C79-9288-A6772BA0CF37

here it is in the overall layout from end of table you can see it beyond the sugar beet area

DAAAD87B-9A2E-4BA6-88B6-3EB9A781EA3CCDDDD24E-CC81-4CF1-B984-9B00ACD08C62

Thanks for lookin!

Attachments

Images (10)
  • 4C5937FE-F1C3-440E-A597-9437CEE0AFFE
  • 71C5B93F-8F4C-4EDC-B90F-C4F7152545D9
  • 74E8F286-8DFF-48E7-B7FA-5A29CB4B67B1
  • 40F17FFE-0E4C-4C21-9CB6-2C01AFFC5D6C
  • A6601ADE-A67D-4947-B389-857CFC84B3C9
  • 97AA12BC-F680-4C79-9288-A6772BA0CF37
  • DAAAD87B-9A2E-4BA6-88B6-3EB9A781EA3C
  • CDDDD24E-CC81-4CF1-B984-9B00ACD08C62
  • 267DD8D1-BA45-42D1-81E0-9563B0EFEA21
  • 3CBDCABF-9CB0-466F-840B-96F3AD47E627
Original Post

Replies sorted oldest to newest

Jim Sandman posted:

Wow.  That is some of the best work I've ever seen!!!

How many hours do you think you have into it?

Jim

 

man i try not to think about that!  I guess maybe 40 hours in research/planning and couple hundred hours give or take for work.  The tough thing about this project was it spanned over about 18+months.  Life kept gettin the way!  It pales in comparison with the 1000s of hours i put into the sugar beet refinery lol. 

thanks to everyone for the compliments!

Add Reply

Post
×
×
×
×
Link copied to your clipboard.
×
×