From a previous layout I have a good amount of Super O track and switches. Currently I’m planning for my dream layout in a dedicated room that will be at least 22’x24’; more if I can finagle it. What I have will not be enough. At this point I’m considering using tubular and going with a traditional post war Plasticville theme. I have all post war engines and rolling stock.
I know I can combine tubular with Super O. But I also like the way Gargaves track and Ross Switches look. My question is; will tubular be operationally and financially more efficient?
Thank you for your guidance,
Jay