Like everyone else, real life takes priority over trains. For quite a while, I have been going to re-track the layout with 5 rail track. This requires widening the layout to get a 42" & 57" loop in. Spent New Years Eve & Day getting the layout width extensions in on two legs of the U. Time for some carpet and track, at least until I run out of track. More is "coming soon".
Steve
The ovals and sidings for Lumar Valley need to be shortened to allow for the Std Gauge looping around it.