Skip to main content

This is just a poll to see if you are operating a layout, dismantling an existing layout, planning a new layout, or building a new layout.  Not looking for a great amount of detail, just a synopsis of where you are now, and where you plan to be in a year.  

 

For me, I am just in the beginning stages of a new basement layout, preparing the room for benchwork.  I hope to have trains running again by spring.  

 

From reading current posts, there are quite a few of us who are in some stage of a new layout.  

Original Post

Replies sorted oldest to newest

Originally Posted by Steve:

Mine unfortunately is in a total state of disrepair and neglect.  Looking more like an abandoned spur, than a mainline.

 

Slowly selling off collection and will eventually tear down the layout and sell off the good Ross track and switches.

Steve:  Sounds like you are leaving the hobby.  Have  you lost interest?

The Genesee Valley and Lake Ontario layout is up and fully operational.  Just had someone over yesterday to check it out and run some of the accessories.

Currently planning a future (6 months - 2 year timeframe) layout in a newly purchased (all of 2 weeks ago) "retirement" log home in the NY Finger Lakes area.  Needless to say, a large, dry, Superior wall basement with 9 foot ceilings was a requirement for the new place.  Can't wait to work on that, with a great deal of assistance of my wife and two married sons, and probably 1 or 2 of the grandkids.

Originally Posted by Tom Hoover:

 Layout is pretty much cluttered with children's furniture & STUFF. Can't get underneath layout for STUFF. All I can do is run my trains, thank goodness. Can't do any  work on layout till they get moved out. Furniture and STUFF under layout & around  room. UUGH!!!!! Hope it isn't long.  Tom

It's funny how it's "stuff" unless it's yours.  That's how I feel too.  

A work in progress.  Always...  I am currently adding a major redo of the West end of the layout.  I am adding a Skyscraper city scene.  This required an additional 12 sq. ft. addition and a complete redo of the track on that side.  So it in only operational in certain areas.  I expect to be finished in the next few weeks.

 

In addition I am continually upgrading my scenery with many of the techniques I have learned here.  That includes working to become more scale in appearance such as lighting and building sizes. 

 

It is hard for me to foresee the day when I would say it is done.  There is always something I would like to buy, enhance or build. 

Uh, which one. Actually I don't have a layout just a bunch of small displays scattered around. All are operational but none will ever be complete until I tear them down and replace them with something else. 14 displays in six years some have come some have gone and their are still some that are just glimmers in my eyes.

My layout has been operational for several years and am in the process of beginning to finish major scenic areas.  I am also adding sidings and industries to enhance the switching operations.  While it will never be totally finished, I am on a major push to raise the level of scenery that is completed.

 

Art

The layout is currently a mess! I tore out a major section to rebuild. Bench work is done, I'm now planning where to lay track.  Did some welding tonight on the bridge that will connect to the new table.  I'm getting a little frustrated with myself since only one of my 4 loops is up and running. 

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×