Skip to main content

There is a great article in the LCCA "The Lion Roars" by Bill Beaty. It's a how to do it with pictures and part numbers on laying 5 rail track for the new Lionel Command Gantry Crane that I bought from Charles Ro. The new crane runs by remote entirely and traverses by a motor along the Gargraves 5 rail track I bought from Gardner, The Train Doctor, by motor and Cab control. Another update over the original crane is the semi permanent on-off feature of the magnet. If you do not turn it off, it goes off by itself in 60 seconds. This crane is really fun to run. Thank you Bill Beaty for a most informative article.

Last edited by cjack
Original Post

Replies sorted oldest to newest

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×