Wellll.......It appears "finally" is not really finally!! I think I am going backwards. I was ready to start more wiring, after running wires to 13 switches and mounting the controllers inside of my cut out, then I decided to change the track plan! (and Christmas is getting closer!!) I added another board and straight track to the outside dogbone/loop. Old plan shown above in top of thread,
I un-did 2 days worth of switch wiring and then............I closed the gap between left and right (see added board), added 2 more switches - to get a full loop with a dogbone. Spent last 2 days re-running the controller wires to all switches! I gotta stop shooting myself in the foot!
Good news is, trains navigate the pattern. Bad news is, I hate the pattern, not real good for running 4 or more trains. I know that the wizards on here would have come up with a better track plan. If this were a permanent layout, I would yank it all up, reconfigure the boards, and start over.
It is getting too close to Christmas to do that. Time to wire up accessories, and start dropping things onto the barren real estate. (I have to cut an insert, and decorate it, to cover the center access panel. I am good at making up work to do! Idiot!)
Greg new plan below.........................new left side shown
