Hello, I currently have 2-tubular tracks running through my hellgate. Before & after it leaves the bridge I would like to change over to atlas o. Does anyone have pics of this or can I just run Atlas straights through the bridge? How can it be fastened down without it being to high if I go atlas all the way? Thanks for any help or pics.
John