Skip to main content

Hello, I currently have 2-tubular tracks running through my hellgate. Before & after it leaves the bridge I would like to change over to atlas o. Does anyone have pics of this or can I just run Atlas straights through the bridge? How can it be fastened down without it being to high if I go atlas all the way? Thanks for any help or pics.

John

Original Post

Add Reply

Post
×
×
×
×
Link copied to your clipboard.
×
×