Regular forum readers may recall I strung some catenary wire last fall, in preparation for the O Scale national;
https://ogrforum.com/...-did-it-prr-catenary
On that section the ceiling is too low, and the scenery configured so that adding the high tension towers atop the K Bridges just did not work. I am now working on a 30 foot section where the towers do fit. I custom made the towers using a jig and brass shapes
All the poles are placed, and the towers have been fitted.
Nothing is bolted down yet (which is why things look a little crooked), but you get the idea. And of course I still need to string all the wires. Stay tuned!