Skip to main content

I took some pre-York pics to document progress ( the pics of my Dennis Brennan’s kits are for the Delta Lines meeting at York).

I’ve spent most of the winter and early spring wiring. I’ve put in a station base and platform. I have moved buildings around and acquired a few more.

All this has taken place while the basement and garage were taken down to the studs and renovated. The renovation still has about 2 weeks plus left.

Then, my post-York focus will be to move the furniture, books, et cetera,  back into the garage and basement, at the same time organizing it (including my modeling space) and throwing out more junk.

I hope to be done by early June. During that time, the layout will be quiet, except for running trains.

When I start up again, I’ll be concentrating on building the half dozen kits I have left; making sidewalks, grade crossings and streets. Then, wiring up signals and crossing gates. If I can get that done by August, I’ll be pleased because then the Base 3 will be out…..

That’s the plan……but is the time allotted realistic? Probably not, but that’s the beauty of retirement!

Peter

IMG_4999IMG_5025IMG_5028IMG_5029IMG_5030IMG_5031IMG_5032IMG_5033IMG_5034IMG_5035IMG_5036IMG_5037IMG_5038IMG_5039IMG_5040IMG_5044IMG_5045IMG_5041IMG_5042IMG_5043IMG_5047IMG_5046IMG_5052IMG_5050IMG_5049IMG_4535IMG_4865

Have a great and safe week, everyone.

Peter

Attachments

Images (27)
  • IMG_4999
  • IMG_5025
  • IMG_5028
  • IMG_5029
  • IMG_5030
  • IMG_5031
  • IMG_5032
  • IMG_5033
  • IMG_5034
  • IMG_5035
  • IMG_5036
  • IMG_5037
  • IMG_5038
  • IMG_5039
  • IMG_5040
  • IMG_5044
  • IMG_5045
  • IMG_5041
  • IMG_5042
  • IMG_5043
  • IMG_5047
  • IMG_5046
  • IMG_5052
  • IMG_5050
  • IMG_5049
  • IMG_4535
  • IMG_4865
Last edited by Putnam Division

Peter, that’s more buildings than I realized you had built.  They all look quite nice!  Your Sanky Wanky looks great, as do the other Brennan’s Frank Ellison buildings.  What do you think of the Hap Hazard building?  I don’t understand the side doors that look like they flip up on Ellison’s building.  Maybe I don’t understand that industry.

Peter,

The buildings look very nice. Like Mark, this post really brings out all of the work you have done over the last few years with them. I can't tell from the photos but have you narrowed placement down at this point? You mentioned what your plans/goals were for August with the sidewalks, etc so inquiry minds want to know.

Dave

@ScoutingDad posted:

@Putnam Division  Peter do you have images of all 4 sides of the freight warehouse with the roof over the loading docks. I am planning on a 40 inch warehouse for my layout. Was that a self- built or a kit/kit bashed?  Thanks ... Jeff

I believe you are referring to this building.

IMG_5049

I’ll take some pics for you next week……..however, it’s a kit from TW TrainWorx and is on their website.

Mike Reagan does an hour plus video on its assembly and painting…….search on You Tube for the Rock Island Freight House painting video.

Peter

Attachments

Images (1)
  • IMG_5049
Last edited by Putnam Division
@Mark Boyce posted:

Peter, that’s more buildings than I realized you had built.  They all look quite nice!  Your Sanky Wanky looks great, as do the other Brennan’s Frank Ellison buildings.  What do you think of the Hap Hazard building?  I don’t understand the side doors that look like they flip up on Ellison’s building.  Maybe I don’t understand that industry.

Mark.....I think they are shutters, no doors.......and old fashioned glass-less windows......

Peter

IMG_5037

@TomSuperO posted:

Peter, your buildings look really nice.  Did you paint them or were they already pre-painted.  The volume of interesting buildings and businesses you have open a lot of possibilities for switching and operating fun. Lot of work. It shows. Nice job.

SuperOTom

Get back to you soon…….I need to put a package of pics together and I’m away from my laptop.

Petrr

@TomSuperO posted:

Peter, your buildings look really nice.  Did you paint them or were they already pre-painted.  The volume of interesting buildings and businesses you have open a lot of possibilities for switching and operating fun. Lot of work. It shows. Nice job.

SuperOTom

Tom.....maybe a quarter of the buildings are Woodland Scenics "built ups", which come decorated and painted. The others are kits by:

Buildings Unlimited

TW TrainWorx

Brennan's Model Railroading

Korber

River Leaf Models

The following is a smattering of pre-painting and painting pictures.

B3219715-6CC2-430B-AC42-1A43A80EBD26D82628CF-82C6-4D49-A9D2-BA676ED7C12144A01B47-62B8-4E9E-8C2E-3BCE3CDCE126BD4D525A-079E-4272-B7BC-90992C139B29ADC58E2E-AD6C-4457-A4F5-43BBF4477C273EA9FD1C-67FB-44B9-B9BF-B3E62BD7A17757B3A0A7-9562-44DC-A27F-8D9AF47FC71B_1_201_a2EE667ED-B1EF-4305-8457-4C5DF805F897BC64AA59-3C4C-4E98-A60F-5E622A44243C8160B727-6941-44DF-9AC7-594ADE9892B3_1_201_a4EBF72E5-5761-4DED-8DDD-778629ECBA893302F4ED-A578-43D4-99C6-022740489A111878AEF8-5E7F-4B69-9582-E3635B84793594135F8C-DF23-4574-9965-4E8F9B373B88

These colors were based on Mike Reagan's video on You Tube, "painting the Rock Island Freight House" .

Peter

Attachments

Images (14)
  • B3219715-6CC2-430B-AC42-1A43A80EBD26
  • D82628CF-82C6-4D49-A9D2-BA676ED7C121
  • 44A01B47-62B8-4E9E-8C2E-3BCE3CDCE126
  • BD4D525A-079E-4272-B7BC-90992C139B29
  • ADC58E2E-AD6C-4457-A4F5-43BBF4477C27
  • 3EA9FD1C-67FB-44B9-B9BF-B3E62BD7A177
  • 57B3A0A7-9562-44DC-A27F-8D9AF47FC71B_1_201_a
  • 2EE667ED-B1EF-4305-8457-4C5DF805F897
  • BC64AA59-3C4C-4E98-A60F-5E622A44243C
  • 8160B727-6941-44DF-9AC7-594ADE9892B3_1_201_a
  • 4EBF72E5-5761-4DED-8DDD-778629ECBA89
  • 3302F4ED-A578-43D4-99C6-022740489A11
  • 1878AEF8-5E7F-4B69-9582-E3635B847935
  • 94135F8C-DF23-4574-9965-4E8F9B373B88
Last edited by Putnam Division

OK……..it’s been nearly 4 months since my last update…….I didn’t want to do one until I had gotten the city scene farther along. There are probably 4 new buildings since the last update …….and 3 Ameritowne buildings are in the que.

The next build is fire escapes…..I have three 4 story apartment buildings that need them…..I moved the camera around to get a lot of different angles. The sidewalk installation of the downtown area has previously been reported. A few industrial buildings have moved around…….

IMG_1363IMG_1365

A 3 story Ameritowne building goes between these 2 River Leaf Models structures….

IMG_1366IMG_1367IMG_1368

A 2 story and a 3 story Ameritowne building will hid the church, but not the steeple……

IMG_1369IMG_1370

Looking east from the industrial area……the right foreground warehouse was previously in another area…..

IMG_1371

The Walter Feed building and the Morrison Door Company were previously in other areas…..

IMG_1372IMG_1373

I may use the 182 Gantry Crane as the centerpiece for a scrapyard in the triangular area cordoned off by the switches….

IMG_1374

The Ameritowne Barrettsburg kit may go here…..or, I may fill it with smaller buildings…..

IMG_1375IMG_1376

On the Mianne Lift Gate, next to the Oblong Box Company, I may build and put this overhead gantry crane and have a team track scene……

IMG_1377

A better view of where I will place the buildings hiding the church……

IMG_1379IMG_1380IMG_1381IMG_1382IMG_1383IMG_1384

The other side of the Texas tavern will have a basketball court…..

IMG_1385

I put that sign up many years ago, when Lionel announced their move to China….

IMG_1386IMG_1387IMG_1390

It is coming along…….street lamps, crossings coming soon……then ballast…..

Have a great and safe week, everyone!

Peter

Attachments

Images (24)
  • IMG_1363
  • IMG_1365
  • IMG_1366
  • IMG_1367
  • IMG_1368
  • IMG_1369
  • IMG_1370
  • IMG_1371
  • IMG_1372
  • IMG_1373
  • IMG_1374
  • IMG_1375
  • IMG_1376
  • IMG_1377
  • IMG_1379
  • IMG_1380
  • IMG_1381
  • IMG_1382
  • IMG_1383
  • IMG_1384
  • IMG_1385
  • IMG_1386
  • IMG_1387
  • IMG_1390
Last edited by Putnam Division

OK……..it’s been nearly 4 months since my last update…….I didn’t want to do one until I had gotten the city scene farther along. There are probably 4 new buildings since the last update …….and 3 Ameritowne buildings are in the que.

The next build is fire escapes…..I have three 4 story apartment buildings that need them…..I moved the camera around to get a lot of different angles. The sidewalk installation of the downtown area has previously been reported. A few industrial buildings have moved around…….

3 story Ameritowne building goes between these 2 River Leaf Models structures….

A 2 story and a 3 story Ameritowne building will hid the church, but not the steeple……

ng east from the industrial area……the right foreground warehouse was previously in another area…..


The Walter Feed building, and the Morrison Door Company were previously in other areas…..

I may use the 182 Gantry Crane as the centerpiece for a scrapyard in the triangular area cordoned off by the switches….


The Ameritowne Barrettsburg kit may go here…..or, I may fill it with smaller buildings…..


On the Maine Lift Gate, next to the Oblong Box Company, I may build and put this overhead gantry crane and have a team track scene……


A better view of where I will place the buildings hiding the church……


The other side of the Texas tavern will have a basketball court…..


I put that sign up many years ago, when Lionel announced their move to China….


It is coming along……. street lamps, crossings coming soon……then ballast…..

Have a great and safe week, everyone!

Peter

Peter, everything is looking great. I love a layout not dominated by track.

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×