I have a 6 x 12 fastrack layout. I had been using Z-1000 transformer to run my conventional engines and accessories. I also wired up the switches, uncoupling tracks and operating tracks to fixed voltage.
I now have a Powerhouse 180, Legacy Powermaster, Trainmaster Base and Cab 1 remote. With help from Gunrunnerjohn it all works great!
Now I want to reconnect my Z-1000 for accessories and fixed voltage to the switches and so on.
Any issues with that plan? From what I've read that the PW and Z-1000 need to be in phase.
Could someone give me an outline how to test the phasing or correct it if needed? If it's easier by phone that's an option as well. I tried to find local help but struck out.