Sorry for the delay, Getting all three kids and myself back into the school schedule. up at 600 am. Its been a rough week. I looked at the three links. U25C, U28C, and U30C.
The lionel U30C appears to be Phase II which would be correct for CBQ( C&S)
The Lionel U28C appears correct for phase II. The issue is that I want to either Kit bash a CBQ U25C phase IIIb or a U28C Phase 1a or 1c
U25C and U28C Total Length: 64'-06"
http://www.thedieselshop.us/GE%20U25C.HTML
http://www.thedieselshop.us/GE%20U28C.HTML
The U30C: Total Length: 67'-03"
http://www.thedieselshop.us/GE%20U30_P30CH.HTML
What I didn't see in this thread was difference in length.
https://ogrforum.com/t...s-mth-u30c-prr-style
For Kitbash purposes. I can start with 2 Weaver U25B (Total Length: 60'-2") shells and with some surgery to the nose and body(insert 4 scale ft) It can be turned into a 25C PH IIIa or 28C PH 1a or 1c.
Chassis is different. but doing initial measurements I have a SD24 Chassis that will work. Now if someone can tell me that the lionel U28C is shorter in length (17") then the Lionel U30C (18") then that will make my life simpler.
Thanks for the input.
U25Cphase3a
U28Cphase1a
U28Cphase2