Skip to main content

Setting up modules, these come as 4' long sections, all the scenery except the track/ballast and grass comes off the top, legs are installed and pins added between module sections

 

 

image2 [3)image4 [2)

Dougs custom NS ACU (SD80 with new GM cab) and my NS (EL) 1700 back down past the station

 

image2 [2)

20th Century limited stops at the IHR station to let people off

image3 [2)

Pair of NS hi hood diesels hustle a train of trailers and racks over a bridge

image4 [1)

Y6b with a long freight

image5

P&LE Berk

image6

 

 

 

Enjoy!

Attachments

Images (7)
  • image2 (3)
  • image4 (2)
  • image2 (2)
  • image3 (2)
  • image4 (1)
  • image5
  • image6
Videos (4)
Video_1 (1)
Video (1)
Video_3
Video_1
Original Post

Replies sorted oldest to newest

Add Reply

Post

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×