Minor repairs to re-solder the rear ladders and fix the tender linkage to my Williams Challenger that took a spill off the layout a number of years ago.
Minor repairs and replace batteries in numerous PS2 MTH locomotives.
Convert a dead PS1 E33 to either conventional or TMCC operation.
Finish my "C-36-7H" NJT 3RS project. Ever since I cut the pilots off the trucks they don't balance right and can't get traction.
Repair the door that fell out of my custom painted and modified NJT 3RS F40PH.
A Crown Craft C&O Caboose half finished kit.
Fix the missing windows in my GGD Congo Coach and in a Walthers Broadway Limited kit of the sleeper / lounge / office car.
Build a Walthers Doodlebug kit, 2 P70Far coaches, N&W 60' RPO, and several 12-1 sleepers.
Convert a dead MTH PS1 GG1 to the Wilmington Shops snow blower.
Finish kitbashing two E60MA projects. One is a BDO shell and the other was made from Williams parts.
Repairs to several pieces of rolling stock.
Complete conversion to 2 rail of several GGD P70's and miscellaneous freight cars.
Convert a Reading Pacific into a 2 rail CNJ 820 series Pacific.
The problem is I work too many hours so none of them are getting attention these days. Lots of deadlines for 3rd Rail and GGD keeping me busy too, which is a totally different way to enjoy the hobby.