Skip to main content

Since we have not been able to set up at any train shows lately, we did set up our extensive layout in a warehouse some months back. Most Saturdays were spent on maintenance work; track repairs, electrical, scenery repairs and upgrades.

This past Sunday, several of us had a "RUN FOR FUN" day. Bob K, Bob H and I ran some of our big engines for several hours testing all the track, switches and electrical upgrades.

Our modular layout is 30 ft by 18 ft. We did not put up any of our buildings, scenery, vehicles, people, etc as we still have some minor work to do. Sure is nice to hang out with the guys weather it's working on the layout or running trains.

Here a couple of photos and a video from Sunday.

RAY

5 trains running at one time:

VIDEO: Bob H on the outside track with his PRR 4-8-2 followed by WP GS2. Bob K middle track running his SP GS4. Ray is on the inside track running his Vision Line UP Challenger and Sunset 2-8-2 #4960.

Sunset CB&Q 2-8-2 #4960 meets UP Vision Line Challenger #3967Ray's Sunset CB&Q 2-8-2 & Vision Line Challanger

CB&Q 4960 meets BK's SD9 355 and GP9 284

4960 meets BK's SD7's

UP Challenger 3967 with a long drag of reefers.Ray's Vision Line Challanger

Attachments

Images (3)
  • Ray's Sunset CB&Q 2-8-2 & Vision Line Challanger
  • Ray's Vision Line Challanger
  • 4960 meets BK's SD9
Videos (1)
BH PRR 4-8-2 & WP GS2 and BK SP GS4 Ray's Challenger and 4960
Original Post

Add Reply

Post
×
×
×
×
Link copied to your clipboard.
×
×