Skip to main content

I HAVE A NEW LIONEL ZW-L TRANSFORMER  I HAVE MTH ENGINES WITH PROTOSOUND AND PROTOSOUND 2

IF I WERE TO REPLACE THESE ENGINE BATTERIES WITH BCR'S WILL THERE B E ANY PROBLEMS  RUNNING THESE ENGINES WITH THE ZW-L  I AM IN THE PROCESS OF BUILDING MY LAYOUT AND I DO HAVE A DCS SYSTEM  WITH THE TIU   

Original Post

Add Reply

Post
This forum is sponsored by MTH Electric Trains

OGR Publishing, Inc., 1310 Eastside Centre Ct, Ste 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
Link copied to your clipboard.
×
×