Skip to main content

Update on my new layout...all buildings wired, signals lighted, track finalized, etc. 15 pounds of ballast ordered. Coming along but not rushing it. Testing, tweaking and fine-tuning of track continues before ballasting. I do not want the "roller coaster" track work like the previous layout with ups and downs, dips, kinks, low joints, and more that caused major headaches. 

All buildings in finalized positions. Silver water tower at front left corner will not stay.

IMG_0545

IMG_0547

Attachments

Images (2)
  • IMG_0545
  • IMG_0547
Post
×
×
×
×
Link copied to your clipboard.
×
×