..... track came undone under the new mountain. (note to self, screw it down next time) Lost Power to mainline. (I had the wrong transformer plugged in) Test run of "Ole Reliable" did not make it under the Hutch in the corner (the 2 year old had stacked the elephants, lion, tiger and... AND Giraffe on the rails.... "Hiding" he said). New tunnel exit at the top of the HELIX sagged when the papermache was applied, and the TALL caboose does not fit the exit anymore. Sent the Lionel Crane and a dozen workers to do a lift and bracejob a the tunnel entrance. AAnd the 5 year old put the Brand New Engine Rebuild on the track to test the smoke......cause Papa said it would be Soo Coool.... Did NOT run. So he wanted to add switches insted. .... .. .... they dont work.
Thas what I did on my layout today. I hope the Dozen Lionel Worker Elves fix stuff over-night... (Note to self, TEST the **** engine before the GrandKids come, and then Re-Package the blame thing, so he gets to "Open The New UPS BOX"!!)
Oh, I get whats important...... and with anyluck, they will again visit in the morning. We will have Pancakes and snasauges, and milk and cookies, and hugs and all the really important things.
Leaving the layout fixes for the ELVES...... (I love being the grandpa....)