I will eventually have about 25 turnouts with DZ2500 switch motors. Does anyone see a problem using an MTH Z1000 brick to power the switch motors from the 14v AC terminals, while using the 18v AC barrel connector to power the electronics of the TIU? For track power, will feed from a Z4000.
Thanks...gregg