Originally Posted by steam fan:
Curious as to the expiration date of the boiler certification... I was under the impression it was 15 years from the day the last flue was installed in the boiler. Thanks!
Actually, I'm pretty sure the FRA regulation relates to the first time there is a FIRE in the firebox PLU pressure in the boiler, beginning the 1472 days of service or 15 years, whichever occurs first. The "installation of the first tube/flue, starts a 12 month "clock", if I remember correctly, and then if the boiler is NOT fired up within THAT 12 months period, then the 15 year "clock" has already started.