Found this while looking at train stuff on youtube. The CP has a neat set up here, if you notice, hardly a drop of water is wasted and the coal load is covered from end to end and side to side. A good shot of the mechanism is at approx. 0:54 seconds in.
https://www.youtube.com/watch?