Guys
The really great feature of this layout imo is that it has 2 mainlines that loop over and under around the length of the layout. You can, and we did have 3 trains on 1 loop and be able to keep them well spaced. You can tell a lot of time and thought went into Andy's planning. It is the layout that I will base my next and final one on. At least in concept.
The layout is well powered as evident by the amount of engines with smoke units and passenger cars on the rails.
BTW, it was all Legacy, all night. 5 remotes all running at once. Come in, turn on and find the base. Change a couple of IDs and we were running trains in about 3 minutes.
I suspect we will see this layout in OGR soon. Once I get a few videos off my iPhone I'll post them to this thread.